Section Reviewer Page Date Original Comment Last Reply Author Last Reply Date Remediated Last Reply Text                                        
Section Section 1 SYSTEM ARCHITECTURE AND HOSTING OPERATIONS French, Shaun 12 5/26/2025 23:37 Required: Does this align with your RPO? Liz Carrier 5/30/2025 11:35 1 This document  and the specific section is addressing IaaS and Paas, it does not include the SQL DB that includes the data within the D365 CRM. As this doc is focused on network, we do not think this applies to the RPO to meet contractual requirement DR 20.  Recovery Point Objective, refers to the maximum amount of data loss an organization can tolerate in the event of a disaster and this is met through the Azure backup process that is designed to use 5 minutes incremental and 24 hour full backups. 
Section Section 1 SYSTEM ARCHITECTURE AND HOSTING OPERATIONS Klinger, Stephanie 13 5/22/2025 13:06 Required: The deliverables for the FX Foundation Release are identified with an a appended to the deliverable. Please correct. Patricka Coleman 6/10/2025 22:10 1 Updated with correct appendix letter “a”.
Section Section 1 SYSTEM ARCHITECTURE AND HOSTING OPERATIONS Klinger, Stephanie 13 5/22/2025 13:11 Required: UOC-295 and UOC-160 both are IDs for elaborated requirements. IV&V recommends updating this to reflect correct user story ID and associated title. Patricka Coleman 6/7/2025 19:38 1 User IDs updated
Section Section 2 MONITORING DAILY OPERATIONS PERFORMANCE French, Shaun 14 5/23/2025 7:55 Required: How are these made available to the agency?  And at what frequency?  Or real time access to tools provided? Liz Carrier 5/30/2025 11:53 1 These KPI’s are not part of the transfer to Splunk log data that is required. This access is through the Azure Portal and then to Azure Monitoring. Is this something that would need to be added into what we are currently sending to EDW? Please advise.
Section Section 2 MONITORING DAILY OPERATIONS PERFORMANCE French, Shaun 15 5/23/2025 7:55 Deliverable Reviewers self-classify their comments (Add type, listed below, as first word in comment, in both comment tracker and Word documents):
Critical: The resolution of these comments, including clarifications, is essential and must be completed to approve deliverable. Discussion with the vendor is likely required to resolve. Required: (Documentation/corrections/formats) The resolution of these comments, including clarifications, is important and necessary to approve the deliverable. Conditional approval to move forward - project tasks dependent upon the approval on this artifact can commence. This artifact will be eligible for payment upon final approval. Suggestion: The resolution of these comments is not necessary for the approval of the deliverable.
Clarification: The resolution of this comment is dependent on discussion between Deliverable Reviewer and vendor. Vendor to reach out to the Deliverable Reviewer to discuss further PRIOR to remediation and resubmission. Vendor to update comment(s) with discussion notes.
Liz Carrier 5/30/2025 11:59 0 N/A
Section Section 2 MONITORING DAILY OPERATIONS PERFORMANCE French, Shaun 15 5/23/2025 7:56 Required: How are these violations reported/delivered to the Agency? Liz Carrier 5/30/2025 12:15 1 I do not think this should have been in this document. The missing of SLA’s is handled through Ops and Management. So if we miss an SLA, these follow that established process.
Section Section 2 MONITORING DAILY OPERATIONS PERFORMANCE French, Shaun 22 5/23/2025 8:03 Required: I don’t see any detail on how you do this, just that you will be looking for ways.  Would like a firmer plan here. Liz Carrier 5/30/2025 12:48 1 UOC works with CoreTek (MSP) for monitoring. Bi-weekly meetings are established to continue to look for ways to improve our processes including monitoring, incident reporting, etc.
Section Section 2 MONITORING DAILY OPERATIONS PERFORMANCE French, Shaun 22 5/23/2025 8:03 Required: I don’t see any detail on how you do this, just that you will be looking for ways.  Would like a firmer plan here. Liz Carrier 5/30/2025 12:48 1 UOC works with CoreTek (MSP) for monitoring. Bi-weekly meetings are established to continue to look for ways to improve our processes including monitoring, incident reporting, etc.
Section Section 2 MONITORING DAILY OPERATIONS PERFORMANCE Klinger, Stephanie 22 5/22/2025 13:09 Required: According to JIRA, UOC-568 references Requirement SEC-047. Please review and make any necessary corrections. In addition, UOC-568 is not the user story, it is the ID for elaborated requirement. Patricka Coleman 6/7/2025 19:59 1 User story IDs updated
Section Section 3 OPERATIONS PROCEDURES French, Shaun 23 5/23/2025 8:04 Required: This section describes an example of how to do a backup, but not a description of the actual implemented procedures. Liz Carrier 5/30/2025 12:57 1 Azure backup is a scheduled process, but is included is Section 3.1.1 for the VM backup.
Section Section 3 OPERATIONS PROCEDURES McDaniel, Dan 24 5/21/2025 10:09 Query:  This is Step 1 of a procedure - I count three procedures in this document arranged in this format.  There is an opportunity here.  Will UOC be compiling these separately with other operational procedures across the products and processes within its responsibility?  If so, could this be shared in the future in that format? Michelle Newbold 6/9/2025 11:06 1 6/9 Remediated with Dan.  Nothing was changed. 
Section Section 3 OPERATIONS PROCEDURES French, Shaun 28 5/23/2025 8:08 Required: Define periodic frequency. Liz Carrier 5/30/2025 13:49 1 Complete.
Section Section 3 OPERATIONS PROCEDURES Klinger, Stephanie 34 5/22/2025 13:13 Clarification: Is this requirement applicable to Service Desk Release? If no, recommend updating this information to indicate as such since this deliverable is being reviewed for the Service Desk Release.  Michelle Newbold 6/6/2025 16:53 1 6/6- AI- if applicable to release A or B6/6.
Section Section 3 OPERATIONS PROCEDURES Klinger, Stephanie 35 5/22/2025 13:13 Required: These user story IDs in exhibit 3-14 are incorrect and mismatched with the Story Title. IV&V recommends the vendor review and update accordingly as they provided the IDs for elaborated requirements. Michelle Newbold 6/6/2025 16:54 1 6/6 Need to assign to team member who has access to JIRA.
Section Section 3 OPERATIONS PROCEDURES French, Shaun 48 5/23/2025 8:10 Required: I’d like to see process around cert management and not just the tool.  For example, how do you manage the process of ensuring certs are updated before they expire and cause outages? Liz Carrier 5/30/2025 14:04 1 The certificate is set for auto-renew and is the only certification UOC is managing for the Solution. Exhibit 3-28 shows that auto renew setting.
Section Section 3 OPERATIONS PROCEDURES Bandari, Naveen 48 5/23/2025 15:38 Recently there was production certificate issue that occurred with D365. If possible please include response and language for the below :What is the monitoring mechanism by UOC?
When do the certificates expire?
Does UOC have any kind of automated mechanism to receive remainders /alerts?
Michelle Newbold 6/9/2025 10:19 1 6/9- Liz to add detail around D365 (MS certificate management process)
Section Section 4 ROUTINE MAINTENANCE French, Shaun 50 5/23/2025 8:11 Required: Only daily?  Is your RPO 24 hours? Liz Carrier 5/30/2025 14:05 1 This document  and the specific section is addressing IaaS and Paas, it does not include the SQL DB that includes the data within the D365 CRM. As this doc is focused on network, we do not think this applies to the RPO to meet contractual requirement DR 20.  Recovery Point Objective, refers to the maximum amount of data loss an organization can tolerate in the event of a disaster and this is met through the Azure backup process that is designed to use 5 minutes incremental and 24 hour full backups. 
Section Section 4 ROUTINE MAINTENANCE French, Shaun 50 5/23/2025 8:12 Required: What are your patching procedures?  How do you ensure patches are tested first in lower environment?  What facilities are in place to perform rollbacks on failures?   Liz Carrier 5/30/2025 14:32 1 Yes all patches are released to the lower environments a week ahead of production. CoreTek, our MSP, does most of these. And all environments are restorable from an image to provide for rollbacks.
Section Section 4 ROUTINE MAINTENANCE Klinger, Stephanie 53 5/22/2025 13:16 Required: These user story IDs in exhibit 4-6 are incorrect and mismatched with the Story Title. IV&V recommends the vendor review and update accordingly as they provided the IDs for elaborated requirements. Patricka Coleman 6/7/2025 19:50 1 User story IDs updated.
Count 19
Remediated 18 94.74%
Not Remediated 1 5.26%